Search
Off-System Bridges
For bridges built by the Parish, not the DOTD Off System Bridge Program (Barbara Ostuno). Once a new bridge is constructed, the owner must provide all required documents prior to opening the bridge to traffic. Please fill out the form below to Add a Bridge to the inventory. The Scour Analysis and Load Rating Summary sheet documents are under Helpful Documents below and must be provided with the form.