Cost Estimation and Value Engineering

Cost Estimation

Cost Estimation Tools

DOTD makes these documents available on an "as is" basis. All warranties and representations of any kind with regard to said documents are disclaimed, including the implied warranties of merchantability and fitness for a particular use. Under no circumstances will the DOTD, or any of its officers or employees be liable for any consequential, incidental, special or exemplary damages even if appraised of the likelihood of such damages occurring. The DOTD does not warrant the documents against deficiencies of any kind. The use of any of these documents for work which is under contract with the DOTD, does not relieve the contractor from any obligations assumed by the contract, or from complete and proper fulfillment of the terms of the contract, nor does it entitle the contractor to compensation for damages or loss which could be attributed to such use. 

Value Engineering

Value Engineering Overview

Value Engineering is a systematic process using a team from a variety of disciplines to improve the value of a project through the analysis of its functions. VE is a proven, effective tool for both continuous improvement and design enhancement. VE optimizes the allocation of limited funds without reducing the quality of a project. 

 

The VE process incorporates the values of design, construction, maintenance, the contractor, state/local/federal approval agencies, other stakeholders, and the public. Value improvements might relate to scope definition, functional design, constructability, internal/external coordination, or the project development schedule. Other possible value improvements are reduced environmental impacts, reduced public inconvenience (traffic), or reduced project cost.

 

Projects with a total estimated cost over $50 million and any bridge project over $40 million are required by FHWA and EDSM I.1.1.18 to have a VE Study performed. This total estimated cost includes preliminary engineering, construction, right of way, and utilities.

 

VE can be applied during any stage of a project’s development, but the greatest resource savings can be achieved early in development during the Planning or Scoping phases. DOTD Project Managers that have projects requiring a VE Study or think a VE study could benefit one of their projects are to schedule a VE Study with the Cost Estimation and Value Engineering Director no later than 3 months prior to the Plan-in-Hand meeting.

Scheduled VE Studies

  • No VE Studies are scheduled at this time.

VE Studies to be Scheduled

  • H.004987.5, US 190 Collins Blvd Widening
  • H.008069.5, Peters Road Bridge & Extension (Phase 3)
  • H.003915.5, I-49 Inner City Connector
  • H.008793.5, Franklin Farms Mega Site
Name Title Phone Number
Charles Nickel, P.E. Cost Estimate and Value Engineering Director 225-379-1078