Search
Avondale Rail Crossing Grade Separation Study Documents
Avondale Rail Crossing Grade Separation Study Documents
DOTD, in coordination with the Federal Highway Administration, the Federal Railroad Administration, the New Orleans Regional Planning Commission and the railroads operating in the New Orleans metropolitan area are further evaluating consolidating the George Street at-grade crossing and the road-over-rail grade separation of Willswood Lane and Avondale Garden Road identified in DOTDs 2025 Avondale Planning and Environmental Linkages (PEL) Study. Three Build Alternatives were recommended for further study, one alternative for the Avondale Garden Road at-grade crossing and two alternatives for the Willswood Lane at-grade crossing. The Live Oak Boulevard at-grade crossing was eliminated from further study because the crossing did not meet FHWA criteria for consolidation or grade separation.
A Public Scoping Meeting is anticipated in late-Summer or early-Fall to discuss this next study phase and solicit public input.
Click here to be added to the mailing list.
| Contact |
|