Search

Right-of-Way Permits

Permit  Used For  Modified 
Automatic License Plate Camera Permit    February 2023
Fiber Optic Permit 

For parallel controlled access only.

If a shared resource exchange is desired to reduce or eliminate the permit fee for fiber optics or wireless installations, please email [email protected] for information prior to submitting the permit application form.

 

Otherwise, submit an original signed form to the District permit office along with a check for the permit fee and four sets of permit drawings.

February 2023
Geophysical Permit Geophysical Surveys February 2023

Mailbox Permit

New, relocated or redesigned mailboxes 5/28/2013
Moveable Property Permit Movement of large objects across highways 2/14/2022

Highway Modification Application

CEA Example 

For use with projects requiring modification of any highway with state oversight (turn lanes, roundabouts, realignments, etc.)  Check with District Permits Specialist. ​October 2024

Project Permit

Railroad Grade Supplement

For use with facilities (not for utilities), pipe bridges, etc. Check with the District Permit Specialist. February 2023
7/19/2023
Seasonal Hay Harvesting Hay Harvesting
Applications are accepted between January 2nd and May 1st.
2/14/2022
Temporary Occupancy Permit Temporary Storage, etc. 
This permit should not be used for Temporary Access Connections.
2/19/2014

Utility Permit

Utility Permit - Calcasieu Bridge​

Bridge Attachment Supplement

Pipe Data Sheet REV 01-17

Certification for Permit Lighting Supplement

Utility installations (water, sewer, electrical, gas, telecommunications, bridge attachments, pipelines, etc.) February 2023
6/4/2012
3/7/2013
7/16/2018
Vegetation Enhancement Permit Vegetation trimming/removal on the Interstate System
Vegetation trimming/removal involving significant trees
Landscaping Enhancement Projects
Outdoor advertising visibility
February 2023
 Vegetation Maintenance Permit Brush clearing
Utility route clearing
Irrigation
Mowing
February 2023
Wireless Permit

Wireless tower facilities and attachments

If a shared resource exchange is desired to reduce or eliminate the permit fee for fiber optics or wireless installations, please email [email protected] for information prior to submitting the permit application form.

 

Otherwise, submit an original signed form to the District permit office along with a check for the permit fee and four sets of permit drawings.

February 2023