Search
LA 1 / LA 415 Connector
Port Allen, West Baton Rouge Parish
Project No. H.005121
Description:
Construction of the full interchange at LA 1 near LA 988 (Beaulieu Lane), transition from LA 1 interchange to a two-lane (single lane each direction) along the LA 415 Southbound roadway, construct the LA 415 SB bridge over ICWW, transition to full interchange improvements and LA 415/I-10.
LA-1 and LA-415 Connector Procurement Documents
